Case Study

Porsche Centre

Units B1 & B2 Boscombe Business Park

Units B1 & B2 Boscombe Business Park

Ryland Cars

Exeter

Phase 1 Completion October 2025


Comprehensive redevelopment of an existing Porsche dealership, including the construction of new premises and the refurbishment of existing buildings. Designed to meet Porsche’s latest specifications and carefully planned to ensure minimal disruption to ongoing business operations.

Click image above for more photos.

Units B1 & B2 Boscombe Business Park

Units B1 & B2 Boscombe Business Park

Units B1 & B2 Boscombe Business Park

Mordrill Industrial Ltd

Avonmouth

Start August 2025  

  

Fourth phase of industrial units speculatively built as warehouses with office and workshop space. Designed to integrate with the existing buildings and compliment industries already represented at the site. Site stabilisation and piled foundations to accommodate poor ground conditions with steel fibre reinforced floor slab to achieve engineered loadings.

Click image above for more photos.

Unit A Boscombe Business Park

Units B1 & B2 Boscombe Business Park

Unit A Boscombe Business Park

  Mordril Industrial Ltd

Avonmouth 

Completion April 2024


Third phase of new industrial estate providing design and build warehouse unit with office facilities for a leading nationwide welfare cabin supplier. Site stabilisation and piled foundations to accommodate poor ground conditions with steel fibre reinforced floor slab to achieve engineered loadings.

Click image above for more photos.

Greggs Drive-Thru

Units D1 & D2 Boscombe Business Park

Unit A Boscombe Business Park

Greggs Drive-Thru

Highbridge

Completion October 2024

   

New build Greggs Drive-thru restaurant to their latest specification and design, with composite cladding in corporate colours.  Piled foundations and retaining wall to accommodate site limitations, tarmac and block paviour finishes. 

Click image above for more photos.

Porsche High Wycombe

Units D1 & D2 Boscombe Business Park

Units D1 & D2 Boscombe Business Park

 Rybrook Cars

High Wycombe

Completion December 2023

   

Construction of new Porsche motor dealership.  Working with the Principal Contractor to provide construction, management, and administration services.  Built to a sustainability assessment framework and due for delivery later this year.


Click image above for more photos.

Units D1 & D2 Boscombe Business Park

Units D1 & D2 Boscombe Business Park

Units D1 & D2 Boscombe Business Park

  Mordril Industrial Ltd

Avonmouth 

Completion May 2023


Second phase of new industrial estate to form two blocks of ‘speculative build’ trade units, with bespoke fit out of each. Piled foundations to accommodate poor ground conditions and steel fibre reinforced slab to achieve engineered floor loadings.

Click image above for more photos.

WR Davies Nissan

WR Davies Nissan

Rhyl 

 Completion January 2024 


Redevelopment of existing vehicle franchise into new Nissan dealership. Including extended showrooms and modernised workshops.

Click image above for more photos.

Costa Coffee

Costa Coffee

Loc8 

Highbridge 

Completion November 2021   


Construction of steel framed building to form new Costa Coffee Drive-Thru incorporating their latest cedar cladding design feature with composite cladding and render. Extensive piling and construction of 'raft' foundation to accommodate poor ground conditions and external works, tracking and landscaping.

Click image above for more photos.

Rolls Royce

Central Park


Rybrook Cars

Hockley Heath

Completion August 2024


 Extensive refurbishment of this existing Rolls Royce motor dealership, encompassing the finery of the brand. 

Click image above for more photos.

Central Park

Central Park

Central Park

Jack Lunn Properties  

Avonmouth 

Completion November 2022


First phase of new industrial estate to form two blocks of ‘speculative build’ trade units, fifteen in total with bespoke fit out of each. Piled foundations to accommodate poor ground conditions and steel fibre reinforced slab to achieve engineered floor loadings.

Click image above for more photos.

Bentley High Wycombe

Rybrook Cars

High Wycombe

Completion December 2022

  

Construction of new Bentley motor dealership, incorporating external works and infrastructure for multi-franchise site.  Working with the Principal Contractor to provide management and construction of this state-of-the-art prestige building, all under the certification of BREEAM.


Click image above for more photos.

Civic Park Shrewsbury

Civic Park

JT Hughes

Shrewsbury

Completion February 2023   


Construction of new commercial units for mixed use including SSANGYONG car dealership and light industrial warehouse space.

Click image above for more photos.

Sentinel Trade Park

Sentinel Trade Park

Sentinel Trade Park

Paterson Enterprises

Shrewsbury

Start October 2024

   

Redevelopment of an existing industrial site into a multi-use business park. The works include extensive refurbishment to accommodate the NHS, providing archive warehousing, administrative office areas and clinical consultation rooms. 


Click image above for more photos.

Kids Planet

Sentinel Trade Park

Sentinel Trade Park

Suma Properties 

Buckshaw Village

Completion March 2022  


Internal demolition and alterations to existing restaurant premises. Refurbishment to provide day nursery facilities for a successful childcare chain including high-end fit out specification and associated external works.

Click image above for more photos.

Toolstation

Sentinel Trade Park

Princess Yachts

Toolstation

Toolstation 

Jack Lunn Properties Highbridge 

Completion November 2021  


Construction of 'speculative build' trade unit.  Leased by Toolstation during the construction period meaning incorporation of tenant specification prior to completion. High loading slab formed on driven pile foundation. 

Click image above for more photos.

Princess Yachts

Prees Heath Heritage Centre

Princess Yachts

Princess Motor Yacht Sales

Southampton

Completion August 2022   

 

Fit out of a high specification yacht sales premises in prime position overlooking the harbour. Luxuriously finished ground floor customer meeting area with first floor administration offices.

Click image above for more photos.

Prees Heath Heritage Centre

Prees Heath Heritage Centre

Prees Heath Heritage Centre

Prees Heath Hertitage Centre

Grocott Developments  

Prees Heath

Completion May 2021   


Rectification works to existing steel frame to form new building. Replacing external walls and roof with entire fit out to form transport museum and conference facilities, including external areas for entertaining large groups.

Click image above for more photos.

Renault Trucks

Prees Heath Heritage Centre

Prees Heath Heritage Centre

Renault Trucks

Renault Trucks 

Bedworth 

Completion May 2022    


Extension to existing truck workshop facilities including new steel framed building, heating and ventilation, exhaust extraction, offices, reception, and welfare facilities. Truck wash bay with access pit, associated equipment and new tarmac service yard to engineered specification.

Click image above for more photos.

Copyright © 2025 Capital Construction Management Contractors Limited - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept